supply temperature a conventional (3G) district-heating network needs on its winter curve; any DC return below it — including warm-water DLC at 45–60 °C — still needs a heat-pump lift to feed it (smaller the warmer the return); low-temperature 4G networks can take warm returns directly

60–80 °Cestimate

Value kindestimate — Interpret this value according to its displayed kind, scope, source, and as-of date.
ScopeNetwork-specific and seasonal, not a design constant: IEA DHC STEP uses 80/40 °C as its conventional reference pair and 55/25 °C for low-temperature networks, with 60/35 °C the step at which server waste heat becomes directly usable. Model the actual network's supply/return curve, minimum delivery temperature, connection pressure, and heat-exchanger approach.
As of2025
SourceIEA DHC Annex XII STEP final report; Renewable & Sustainable Energy Reviews review
Reviewchecking…review by 2027-03-01 · standard cadence
Recorded changeslast 2026-09-04 · 3 revisions tracked
Claim idsupply-temperature-a-conventional-3g-district