modeled wind/solar overbuild to serve a flat data-centre load in LUT's Finnish techno-economic study (with renewable-fuel backup); modeled €103–121/MWh full baseload
~7xmodeled
| Value kind | modeled — Interpret this value according to its displayed kind, scope, source, and as-of date. |
|---|---|
| Scope | LUT University model of Finnish wind-and-solar supply with renewable-fuel backup and an inflexible load. Not a universal solar multiplier, not an 'ideal site' result, and not a finding that the economics fail — the study reports technical and economic feasibility at ~€103–121/MWh and a substantial benefit from demand flexibility. |
| As of | 2026-06-16 |
| Source | LUT University, first-party study account created 26 May 2026 and updated 16 June 2026. · Finnish wind/solar, renewable-fuel backup, full-baseload cost and flexibility discussion |
| Review | checking…review by 2027-06-12 · standard cadence |
| Recorded changes | last 2026-09-16 · 5 revisions tracked |
| Claim id | solar-wind-overbuild-to-firm-an-ideal-site-to |
Where the guide uses it
- 3.5 On-Site & Bring-Your-Own-Power Generation (Energy-Supply Strategy)
- 15.3 Carbon, Clean Power Procurement & 24/7 Carbon-Free Energy
← Full numbers register — every date-stamped figure in the guide, with revision history.