Largest single-chassis AI spine radix (7800R4-class modular, 460 Tbps): 576x800G or 1,152x400G — the ceiling below which the entire back-end fabric can be a single tier (one switch, or one per plane), eliminating the leaf tier's optics and cabling; two-tier on such spines is vendor-rated past 160k 800G endpoints

576 x 800Gobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
CaveatVendor datasheet figures; the 160k+ two-tier number is a vendor scaling rating, not a documented deployment.
As of2026
SourceArista Networks
Reviewchecking…review by 2026-09-26 · fast cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim idsingle-tier-modular-spine-ceiling