single-namespace aggregate at the top of the all-flash range (Pure FlashBlade//EXA ~10 TB/s measured class; WEKApod 3 claims 10.2 TB/s + 1.1 EB effective + 210M IOPS per 56U rack on Micron 245 TB QLC — vendor datasheet, delivery from Fall 2026)
~10 TB/sobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Caveat | WEKApod 3 figures are vendor datasheet peaks (effective capacity includes data reduction); no third-party rack measurement as of Aug 2026. WEKA is no longer software-only — WEKApod 3 is a first-party appliance line, with NeuralMesh 6 shipping on the first systems. |
| As of | 2026-07 |
| Source | vendor reference architectures · Page 1, “Industry-leading Performance”: 10+ TB/sec read in a single namespace |
| Review | checking…review by 2026-08-13 · standard cadence |
| Recorded changes | last 2026-08-19 · 3 revisions tracked |
| Claim id | single-namespace-aggregate-at-the-top-of-the |
Where the guide uses it
Not quoted in a chapter yet; it is kept in the curated register.
← Full numbers register — every date-stamped figure in the guide, with revision history.