Singapore SS 697 tropical-DC raised-temperature target (~2–5% cooling-energy saving per 1°C)
26°C+observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Raised air-operating-temperature guidance. IMDA describes 26°C+ and potential 2–5% cooling-energy savings per 1°C; neither a universal measured saving nor a water-supply class. Full licensed clauses were not opened. |
| As of | 2023 |
| Source | IMDA, Tropical Data Centre Standard (SS 697:2023) public summary. Year precision encoded as January 1. · About Tropical DC Standard: 26°C and above; 2–5% cooling-energy savings per 1°C increase |
| Review | checking…review by 2027-09-08 · standard cadence |
| Recorded changes | last 2026-09-16 · 2 revisions tracked |
| Claim id | singapore-ss-697-tropical-dc-raised-temperature |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.