share of withdrawn water that is consumed (lost to evaporation) at an evaporative plant

~85%observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeTypical open-tower evaporative share of withdrawn water that leaves as vapor; the site’s fraction follows its blowdown, drift and cycles of concentration.
As of2025
SourceEESI; Nixon Peabody
Reviewchecking…review by 2026-07-27 · standard cadence
Recorded changeslast 2026-06-29
Claim idshare-of-withdrawn-water-that-is-consumed-lost