share of the distribution-upgrade cost borne by the large load under PGE Schedule 96 (Oregon POWER Act template)
100% upgrade costobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | PGE Schedule 96 template; verify the operative sheets and the project facilities agreement — transmission-level allocation follows the interconnection study and the executed agreement, not the product label. |
| As of | 2026-05-07 |
| Source | Oregon PUC Order No. 26-154, Docket UM 2377 (entered 7 May 2026), as reported by Utility Dive (28 May 2026): customers cover 100% of distribution network upgrades needed to serve their projects. Oregon PUC media release PR-202609 states the cost-causation principle behind Schedule 96. Environment+Energy Leader (2026) counts 23 states with some form of large-load class. |
| Review | checking…review by 2027-05-07 · standard cadence |
| Recorded changes | last 2026-09-16 · 2 revisions tracked |
| Claim id | share-of-distribution-transmission-upgrade |