The 48 V OCP rack bus remains within the stated <60 V DC SELV boundary; low touch voltage does not eliminate arc, thermal-burn, short-circuit, stored-energy, or conductive-tool hazards

<60 V DCobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeContact-voltage classification only; not an exemption from task-specific electrical safe-work controls
CaveatAvailable fault current, clearing time, stored energy, working distance, and the task—not nominal voltage alone—govern arc and thermal controls. Follow the listed assembly, manufacturer instructions, and project electrical safety program.
As of2025
SourceOCP ORV3 base specification; IEC 60364
Reviewchecking…review by 2026-08-12 · standard cadence
Recorded changeslast 2026-08-23 · 2 revisions tracked
Claim idselv-touch-safety-ceiling-that-fixes-the-ocp