Nonstructural component importance factor Ip = 1.5 for life-safety or hazardous-material components and components required for continued operation of a Risk Category IV facility; otherwise Ip = 1.0
Ip = 1.5 (scoped)observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Ip is assigned according to the component’s function and failure consequences, not categorically to every component in every data center. It is distinct from the structural seismic importance factor Ie. |
| As of | 2023 |
| Source | National Institute of Standards and Technology, NIST GCR 23-037 · Section 2.3.3 and Table 2-2, pp. 48–49; Section 3.3.3, pp. 85–86 |
| Review | checking…review by 2026-09-23 · standard cadence |
| Recorded changes | last 2026-07-14 · 2 revisions tracked |
| Claim id | seismic-importance-factor-for-data-centers-as |