physical cable-object reduction from high-density pre-terminated MPO trunking against a named discrete-jumper baseline
topology-derivedderived
| Value kind | derived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method. |
|---|---|
| Scope | Calculate with like-for-like cable objects, endpoints, lane/fiber counts, fan-out, and redundancy. |
| As of | 2026 |
| Source | Named topology and project cable schedule |
| Review | checking…review by 2026-09-12 · standard cadence |
| Recorded changes | last 2026-08-31 · 2 revisions tracked |
| Claim id | reduction-in-physical-cable-count-from-high |
Where the guide uses it
Not quoted in a chapter yet; it is kept in the curated register.
← Full numbers register — every date-stamped figure in the guide, with revision history.