reduction in peak grid power demand on Megatron training, measured on an instrumented GB200 rack fitted with the GB300 power-shelf energy-storage, GPU-burn and ramp-control features

30%observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeNVIDIA's July 2025 demonstration instrumented a GB200 rack carrying the new GB300 power shelf and ran a Megatron workload; it is not a comparison of a GB300 rack against a GB200 rack. One workload and one instrumented setup — qualify the installed load and smoothing controls at L4 rather than budgeting the reduction from a rack choice.
As of2025
SourceNVIDIA Developer (GB300 steady power)
Reviewchecking…review by 2026-09-04 · standard cadence
Recorded changeslast 2026-06-29
Claim idreduction-in-peak-grid-power-demand-on-megatron