RDHx capacity per rack with active door fans (~50–100 kW mainstream, specialist doors to ~200 kW); no published rating supports a passive-door kW band; ~$8–15k/rack

~50–100 kW (active)observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
CaveatCapacity is conditional — always quote entering-water temperature, airflow and water flow with the number. nVent RDHX Pro is rated 78 kW at 14 °C entering water and 44 kW at 24 °C: the same door, two apparent bands. No published rating supports a passive-door kW band.
As of2026-04
SourceOCP Door HX
Reviewchecking…review by 2026-10-20 · standard cadence
Recorded changeslast 2026-10-05 · 4 revisions tracked
Claim idrdhx-capacity-per-rack-passive-15-30-kw-active