rack power across the inflection: HPE GB200 NVL72 (132 kW rack TDP) → GB300 NVL72 (135 kW rack TDP; 155 kW peak; up to 142 kW facility design basis) → VR200 NVL72 (188 kW Max Q; 228 kW Max P; 330 kW facility design basis) → Rubin Ultra / Kyber (~600 kW H2 2027 roadmap planning point)

132 kW HPE GB200 rack TDP → GB300 135 kW rack TDP / 155 kW peak / up to 142 kW facility basis → VR200 188 kW Max Q / 228 kW Max P / 330 kW facility basis → ~600 kW Rubin Ultra / Kyber roadmapforecast

Value kindforecast — Forecasts are time-bound outlooks, not specifications; test decisions across plausible scenarios.
As of2026-08
SourceComposite across products and power boundaries; each figure has its own document. HPE QuickSpecs (GB200 NVL72, 132 kW rack TDP); Lenovo Press LP2357 (GB300 NVL72, 135 kW rack TDP, up to 155 kW peak); NVIDIA Enterprise RA and DSX Facilities Infrastructure Design Guide v2.0 (GB300 up-to-142 kW and VR200 330 kW facility design bases); Pegatron RA4803-72N3 (VR200 188 kW Max Q, 228 kW Max P); NVIDIA GTC 2025 keynote, reported by Tom's Hardware (Rubin Ultra / Kyber ~600 kW). Rack TDP, peak draw and facility design basis are different boundaries and must not be compared like for like; the ~600 kW entry is a roadmap planning point, not a shipping specification.
Reviewchecking…review by 2026-12-04 · standard cadence
Recorded changeslast 2026-09-04 · 5 revisions tracked
Claim idrack-power-across-the-inflection-legacy-gb200