Proposed CLO/CLOP registry criteria: a Computational Load Site with total connected load ≥50 MW supplied through equipment connected at ≥100 kV, from one or more points of connection, registers its owner as Computational Load Owner and its operator as Computational Load Operator (NERC second-round posting, 2026-08-19)
≥50 MW @ ≥100 kVproposed
| Value kind | proposed — Proposed values are not yet final requirements or specifications; track the decision or rulemaking that can change them. |
|---|---|
| Scope | Proposed Rules of Procedure Appendix 5B criteria posted 2026-08-19 (comments closed 2026-09-18); site aggregation across one or more points of connection. Not effective until NERC files it under FERC Order RD26-7-000 and FERC approves — verify the operative filing and appendices before assigning owner/operator obligations. |
| As of | 2026-08-19 |
| Source | NERC, proposed Rules of Procedure Appendices 2/5A/5B (Computational Load Owner/Operator registry criteria), second-round posting 2026-08-19; Steptoe analysis · Appendix 5B redline: Computational Load Site of at least 50 MW total connected load supplied at ≥100 kV; CLO/CLOP definitions in Appendix 2 |
| Review | checking…review by 2027-01-15 · standard cadence |
| Recorded changes | last 2026-09-16 · 3 revisions tracked |
| Claim id | proposed-cle-bright-line-1-mw-it-load-within-20 |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.