post-quantum signatures + KEM in Caliptra 2.x via open-source Adams Bridge accelerator (CNSA 2.0 path), side-channel hardened
Caliptra 2.1: ML-DSA + ML-KEMobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Reference IP capabilities; implementation options and product integration must be verified for the shipped platform. |
| As of | 2025-10 |
| Source | CHIPS Alliance Caliptra 2.1 announcement · Caliptra 2.1 announcement; Adams Bridge integration |
| Review | checking…review by 2026-09-01 · standard cadence |
| Recorded changes | last 2026-09-16 · 2 revisions tracked |
| Claim id | post-quantum-signatures-kem-in-caliptra-2-x-via |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.