reported paired stormwater-storage planning quantities; do not treat the rounded ft³ and gallon figures as an exact conversion or a universal one-acre requirement

source reports >500,000 ft³ and >4M gallons (separately rounded)observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeExact conversion: 500,000 ft³ is about 3.74M US gal. Required storage is jurisdiction-, site-, rainfall-, soil- and design-specific.
As of2025
SourceInformed Infrastructure (Atlanta case) · Atlanta project example; reports more than 500,000 cubic feet, or more than 4 million gallons, of post-construction storage
Reviewchecking…review by 2026-11-06 · standard cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim idpost-construction-stormwater-storage-required