cold-plate pressure drop is product-, fluid-, temperature- and flow-specific; use the selected OEM pressure-flow curve including the declared fittings and quick disconnects
Use the named OEM pressure-flow curverecommendation
| Value kind | recommendation — Recommendations are design guidance, not measured facts; validate them against the project boundary conditions. |
|---|---|
| Scope | A full test loop's pressure drop is not a per-cold-plate value. |
| As of | 2026-08-24 |
| Source | Open Compute Project, ACS Cold Plate Requirements · Pressure-drop characterization at declared coolant and flow conditions |
| Review | checking…review by 2026-12-22 · standard cadence |
| Recorded changes | last 2026-08-24 · 2 revisions tracked |
| Claim id | per-module-cold-plate-pressure-drop-depending |
Where the guide uses it
Not quoted in a chapter yet; it is kept in the curated register.
← Full numbers register — every date-stamped figure in the guide, with revision history.