The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

Patent US11848296B2 describes a vertical package power-delivery embodiment with ESR/ESL reductions of 66%/42.8%

66% / 42.8% in patent embodimentmodeled

Value kindmodeled — Interpret this value according to its displayed kind, scope, source, and as-of date.
ScopeSpecific patent embodiment and comparison; no general rack efficiency, power-loss or availability guarantee.
As of2023-12-19
SourceAdvanced Semiconductor Engineering (ASE) — Patent disclosure and simulated impedance example; not a Vicor production system measurement. · Description after Figure 5: simulated impedance curve and ESR/ESL reduction paragraph
Reviewchecking…review by 2027-09-05 · standard cadence
Recorded changeslast 2026-09-16 · 2 revisions tracked
Claim idpdn-esr-esl-reduction-from-vertical-vs-lateral

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.