Flex specifies 110 kW DC output for its NVIDIA Vera Rubin NVL72 power shelf.
110 kW per shelfobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Vendor shelf output specification; not whole-rack power or usable capacity after a shelf failure. |
| As of | 2026-06-01 |
| Source | Flex, Vera Rubin NVL72 power-shelf datasheet, June 1, 2026; technical specifications. · Power shelf technical specifications: 6 × 18.4 kW; 52 VDC output; three-phase 346–480 VAC input. |
| Review | checking…review by 2027-03-08 · standard cadence |
| Recorded changes | none recorded |
| Claim id | part4-flex-vera-rubin-shelf-output |