OCP Open Rack Wide Meta Design Specification listed revision
1.0 · APR26observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Meta Design document; distinct from the ORW base specification and preliminary canister guide. Revision as listed on the publisher page, which states no publication date. |
| As of | 2026-04 |
| Source | OCP Rack & Power specifications library; April 2026 is the listed submission month. · RACK Standards / Open Rack Wide (ORW) Meta Design Specification |
| Review | checking…review by 2027-03-05 · standard cadence |
| Recorded changes | last 2026-09-16 |
| Claim id | part0-orw-meta-design-specification-revision |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.