NVIDIA DSX Facilities Infrastructure Design Guide v2.0 TCS design-flow criterion
At least 1.5 L/min per kWrecommendation
| Value kind | recommendation — Recommendations are design guidance, not measured facts; validate them against the project boundary conditions. |
|---|---|
| Scope | DSX CDU and technology-loop design criterion. State the kW basis in the project schedule and separately meet each connected rack's approved flow, temperature and pressure envelope. |
| As of | 2026-08-19 |
| Source | NVIDIA DSX Facilities Infrastructure reference design overview (Design Guide v2.0, 19 August 2026), mechanical gallery CDUs |
| Review | checking…review by 2027-02-19 · standard cadence |
| Recorded changes | last 2026-10-25 |
| Claim id | p5-dsx-tcs-design-flow |
Where the guide uses it
Not quoted in a chapter yet; it is kept in the curated register.