Cost to move one LAION-5B image download (~220 TB at LAION's default 384-px img2dataset configuration) out of AWS at published tiers

~$14,800derived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopeList price at published tiers, one full download; negotiated rates lower. Size is the 384-px image set, not the 9 TB embeddings or 800 GB index.
As of2026-08
SourceLAION img2dataset LAION-5B download guide (Romain Beaumont, LAION): "The below config produces a dataset of size 220TB" at 384-px resizing (a 256-px resize gives ~50 TB). Cost derived at the AWS us-east-1 tiers in the 2026-08-31 Price List: 10 TB x $0.09 + 40 TB x $0.085 + 100 TB x $0.07 + 70 TB x $0.05 = $900 + $3,400 + $7,000 + $3,500 = $14,800. The widely quoted ~$15,800 rests on a third-party 240 TB estimate, not a LAION figure. · img2dataset dataset_examples/laion5B.md, "Download the images" section; AWS DataTransfer-Out-Bytes tiers.
Reviewchecking…review by 2027-03-08 · standard cadence
Recorded changeslast 2026-09-16
Claim idp2b-9-1-laion-5b-egress