The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

transceiver and retimer power NVIDIA says an optical NVL72 scale-up would have needed, avoided by copper NVLink

~20 kW/rackestimate

Value kindestimate — Interpret this value according to its displayed kind, scope, source, and as-of date.
ScopeCounterfactual vendor estimate for the named NVL72 design as reported; not measured per-module power and not a saving transferable to another fabric.
As of2024-03
SourceSemiAnalysis, Nvidia’s Optical Boogeyman, 25 March 2024, quoting NVIDIA’s GTC 2024 keynote: the transceivers and retimers alone would have cost 20,000 watts — 20 kilowatts — per NVL72 rack had scale-up used optics instead of copper. · Keynote quotation on NVL72 copper NVLink cabling
Reviewchecking…review by 2027-03-08 · standard cadence
Recorded changeslast 2026-09-16
Claim idp2b-8-9-nvl72-transceiver-power

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.