800G LPO DR8 module maximum power (FS product launch), about half an 800G DSP module
≤8.5 Wobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | One vendor’s DR8 module; host equalization power sits outside the module figure. |
| As of | 2025-09 |
| Source | StorageNewsletter, FS Launches 800G Linear Pluggable Optics (LPO) Module, 2 September 2025: the FS 800G LPO DR8 module operates with a maximum power consumption of 8.5 W, approximately 50% lower than 800G DSP-based modules. · Product power paragraph |
| Review | checking…review by 2027-03-08 · standard cadence |
| Recorded changes | last 2026-09-16 |
| Claim id | p2b-8-9-lpo-800g-power |