The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

copper reach at 800G-class rates: passive DAC ~1–2 m; active electrical cable up to ~7 m; optics beyond

~1–2 m DAC; up to 7 m AECestimate

Value kindestimate — Interpret this value according to its displayed kind, scope, source, and as-of date.
Scope2025–26 reference points at 112G/lane-class electrical lanes; 224G/lane channels are shorter — verify the qualified host/cable channel at your lane rate.
As of2026-01
SourceSemiAnalysis, Co-Packaged Optics (CPO) Book: Scaling, 1 January 2026: copper-based scale-up solutions are limited in range to two meters at most. Credo, ZeroFlap AEC product page: 800G AECs at 112G per lane span 1 m to 7 m. · SemiAnalysis copper-reach sentence; Credo 800G reach table
Reviewchecking…review by 2027-03-08 · standard cadence
Recorded changeslast 2026-09-16
Claim idp2b-8-9-copper-reach

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.