Singapore data-centre pause (2019–2022) and the capacity released by the Green Data Centre Roadmap

≥300 MW near-term (30 May 2024) on >1.4 GW installedobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeCapacity is released through IMDA/EDB calls for application (pilot DC-CFA; DC-CFA2 launched December 2025), not open connection; installed base and allocation criteria are separate claims.
As of2024-05-30
SourceIMDA, Green Data Centre Roadmap (30 May 2024): total capacity exceeding 1.4 gigawatts; ‘at least 300 megawatts (MW) of additional capacity in the near term, with much more through green energy deployments’; the pilot Data Centre Call for Application (DC-CFA). Linklaters TechInsights (4 June 2024): the moratorium announced in 2019 was lifted in 2022 after the pilot DC-CFA selections; a potential further ~200 MW for green-energy deployments.
Reviewchecking…review by 2027-05-30 · standard cadence
Recorded changeslast 2026-09-16
Claim idp2a-singapore-dc-moratorium-and-green-roadmap