operating oxygen level for hypoxic fire-prevention vs 20.9% ambient; governed by EN 16750

15–17% O2observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2025
SourceEN 16750 (hypoxic fire-prevention); Assured Automation · Protected-area access requirements; operating oxygen concentration shown as >15–17 Vol.% and discussed in connection with EN 16750
Reviewchecking…review by 2026-10-27 · standard cadence
Recorded changeslast 2026-07-21 · 2 revisions tracked
Claim idoperating-oxygen-level-for-hypoxic-fire