of server exhaust heat captured by a correctly sized rack-mounted door coil (room-neutral)
up to ~100%observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| As of | 2026 |
| Source | Motivair (Schneider Electric) ChilledDoor; Vertiv RDHx educational · ChilledDoor product page: '100% heat removal' / heat-neutral white space; up to 75 kW per rack (page bot-blocks fetch; figure visible in indexed copy) |
| Review | checking…review by 2027-03-29 · fast cadence |
| Recorded changes | last 2026-07-10 · 2 revisions tracked |
| Claim id | of-server-exhaust-heat-captured-by-a-correctly |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.