OCP Open Data Center design targets for the heaviest single rack and for an ML rack plus power sidecar

8,000 lb single rack (28 × 48 in); 15,000 lb ML rack + sidecar (56 × 48 in)recommendation

Value kindrecommendation — Recommendations are design guidance, not measured facts; validate them against the project boundary conditions.
ScopeFootprint pressure, not a uniform floor-design load: 8,000 lb over 28 × 48 in (9.33 ft²) is about 857 lb/ft², and 15,000 lb over 56 × 48 in (18.67 ft²) is about 804 lb/ft². Handling equipment counts in the moving load. Platform wet weights (GB200/GB300 NVL72 about 3,000–3,300 lb, Vera Rubin NVL72 about 4,000 lb) are separate figures.
CaveatDesign targets for 2027–2028 AI/ML systems in a voluntary multi-vendor specification (AMD, Google, Meta, NVIDIA); not measured or shipping racks.
As of2026-08-27
SourceOpen Compute Project, Open Data Center: Next-Generation ML Infrastructure Design Principles, rev 0.7.0, effective 2026-08-27 · §4.1 Structural and Weight requirements, p. 7
Reviewchecking…review by 2027-04-30 · standard cadence
Recorded changeslast 2026-10-15
Claim idocp-odc-rack-weight-design-target