NVLink 6 per-GPU bandwidth (Vera Rubin, shipping spec); 900 GB/s Hopper, 1.8 TB/s Blackwell — ~216 TB/s per NVL72 rack

3.0 TB/sobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeShipping spec, bidirectional aggregate per GPU. NVIDIA announced 3.6 TB/s per GPU and 260 TB/s per NVL72 in its Jan–Mar 2026 technical blogs and at Hot Chips (Aug 2026); its product pages and the first OEM shipping release (Sep 2026) list 3 TB/s and 216 TB/s.
As of2026-09
SourceNVIDIA Vera Rubin NVL72 and NVLink product pages (checked 2026-09-29); Supermicro Vera Rubin NVL72 shipping release, 2026-09-23.
Reviewchecking…review by 2027-01-31 · standard cadence
Recorded changeslast 2026-10-05 · 2 revisions tracked
Claim idnvlink-6-per-gpu-bandwidth-rubin-900-gb-s