NVIDIA row-remap failure-flag conditions (RMA requires Field Diagnostic validation): a further uncorrectable-error remap on a bank already holding eight remapped rows, a duplicate-row remap, or 512 total remappings

8 rows / 512 remapsobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeThe flag is the qualifying condition, not the counter itself: reaching eight remapped rows does not by itself qualify a GPU, and the NVIDIA Field Diagnostic determines RMA eligibility. Generation-specific — Blackwell attempts an on-package HBM channel repair on a third remap attempt where a spare channel is available. Cite the documentation version in force for the platform.
As of2025
SourceNVIDIA, GPU Memory Error Management, RMA Policy Thresholds for Row Remapping (current documentation page). The 2025 source vintage is retained because the page does not identify a new publication date. · Current RMA policy: bank already holding eight uncorrectable-error remaps, remapping an already remapped row, or 512 total remappings; RMA requires the failure flag and NVIDIA Field Diagnostic validation. Blackwell channel repair is generation-specific.
Reviewchecking…review by 2026-12-08 · standard cadence
Recorded changeslast 2026-09-16 · 2 revisions tracked
Claim idnvidia-hbm-row-remap-rma-thresholds-8-remapped