operating PUE range documented by Nordic hyperscale/wholesale operators (Google Hamina 1.09 TTM 2024; Meta Luleå ~1.07; atNorth portfolio 1.20 at design load) vs the global average annual PUE of 1.54 (Uptime Institute 2025 survey, n=681)

~1.07-1.20 vs 1.54 globalobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeOperator-reference range, not a universal design guarantee — PUE comparisons are sensitive to utilization, redundancy, measurement boundary and climate. Dense AI liquid-cooling plants still gain at the heat-rejection stage.
As of2024-2025
SourceUptime Institute 2025; Google/Meta/atNorth operator disclosures
Reviewchecking…review by 2026-10-22 · standard cadence
Recorded changesnone recorded
Claim idnordic-operating-pue-vs-global-average