The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

vendor-reported conductor comparison for a stated 415 VAC → 800 VDC topology and loss basis

157% / ~61%observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeTopology-, conductor-count-, route-, temperature- and loss-basis-specific; recompute for the project one-line.
CaveatNVIDIA (2025-10-13): 800 VDC carries 157% more power than 415 VAC at the same wire gauge. The reciprocal copper saving is ~61% for equal power, not the ~45% previously paired with an ~85% figure from an earlier NVIDIA basis. Both are topology-specific vendor comparisons, not constants — compute your own from conductor count and route.
As of2025-10
SourceNVIDIA Technical Blog, 800 VDC architecture
Reviewchecking…review by 2026-11-23 · standard cadence
Recorded changeslast 2026-07-27 · 3 revisions tracked
Claim idmore-power-through-the-same-conductor-or-less

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.