modeled ETTR (goodput) for a 16k-GPU run moving from 60-min to 5-min checkpoint interval
0.70 → 0.93modeled
| Value kind | modeled — Interpret this value according to its displayed kind, scope, source, and as-of date. |
|---|---|
| Scope | Hypothetical dedicated RSC-1 case with nonblocking checkpoint writes: 60-minute versus 5-minute interval. Not a production observation or a universal improvement curve. |
| As of | 2024 |
| Source | Meta paper; keep assumption of nonblocking writes beside the modeled result. · §III, Analysis of ETTR Results; hypothetical dedicated 16,000-GPU RSC-1 run |
| Review | checking…review by 2026-10-14 · standard cadence |
| Recorded changes | last 2026-09-16 · 2 revisions tracked |
| Claim id | modeled-ettr-goodput-for-a-16k-gpu-run-moving |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.