minimum secondary-supply margin CDUs hold to prevent condensation on the TCS loop

~2 °C above dew pointobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2025
SourceIntel · Liquid-cooling requirements note: coolant temperature must always be 2°C above dew point