Keysight presents a 24-72 hour long-term interconnect test scenario; acceptance dwell and packet-loss, latency, BER/FEC and thermal criteria remain project- and OEM-test-plan specific
24-72 h example; test-plan specificrecommendation
| Value kind | recommendation — Recommendations are design guidance, not measured facts; validate them against the project boundary conditions. |
|---|---|
| Scope | Example test duration, not a standards-body minimum. |
| As of | 2026-08-24 |
| Source | Keysight, Validating 800GE and 1.6TE Interconnects · Long-term testing scenario and pass/fail measurements |
| Review | checking…review by 2026-09-23 · fast cadence |
| Recorded changes | last 2026-08-24 · 2 revisions tracked |
| Claim id | minimum-link-flap-soak-under-line-rate-load-at |