Microsoft FY2025 WUE across its fully owned and controlled datacenters operational for the full year

~0.27 L/kWhobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeFully owned and controlled datacenters operational for the full fiscal year. Numerator: cooling and humidification water; not EU all-functions total input. The zero-evaporation next-generation design is a separate claim.
As ofFY2025 (2024-07-01–2025-06-30)
SourceMicrosoft Datacenters, Measuring energy and water efficiency, FY25 table and methodology; fiscal period ended 30 June 2025. · FY25 global row, water numerator, full-year operational boundary and fiscal-year definition
Reviewchecking…review by 2027-03-05 · standard cadence
Recorded changeslast 2026-09-16 · 4 revisions tracked
Claim idmicrosoft-fy2025-fleet-wue-next-gen-closed-loop