The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

AMD MI455X peak HBM4 memory bandwidth per accelerator

23.3 TB/sobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeVendor peak for one MI455X (12 HBM4 stacks, 432 GB). The Helios rack spec table gives the same 23.3 TB/s per GPU; AMD's 2025 Helios preview, and one compute-tray description still on the Helios page, give 19.6 TB/s. A delivered OEM configuration may list a different value.
CaveatAMD's comparison panel sets this against Vera Rubin's announced 22 TB/s; NVIDIA's shipping specification is 19.2 TB/s per GPU.
As of2026-10
SourceAMD Instinct MI455X product page (read 2026-10-19); the same figure appears in AMD's Hot Chips 2026 MI400 talk (2026-08-24). · GPU Memory: Stacks of Memory 12; Peak Memory Bandwidth 23.3 TB/s.
Reviewchecking…review by 2027-01-15 · standard cadence
Recorded changeslast 2026-10-19
Claim idmi455x-hbm4-peak-bandwidth-23-3-tb-s

Where the guide uses it

Not quoted in a chapter yet; it is kept in the curated register.

← Full numbers register — every date-stamped figure in the guide, with revision history.