Meta production RoCE fabric overprovisioning (under-subscription): rail-switch uplink capacity first doubled to run 1:2 under-subscribed against ECMP flow collisions, later trimmed to 1:1.125 — deliberately not 1:1, to keep buffer for up to two link failures

1:2 → 1:1.125observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2024-08
SourceEngineering at Meta
Reviewchecking…review by 2026-09-26 · fast cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim idmeta-rtsw-under-subscription-ratio