The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

Meta's Disaggregated Scheduled Fabric (DSF) — VOQ, credit-scheduled, cell-sprayed (Jericho3-AI leaves, Ramon3 fabric) — reported at an interconnected GPU scale of 18K x 800G; productized scheduled fabrics (DES-class) list >27,000 x 800G ports in a single logical switch

18K x 800Gobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
CaveatDES-class >27k figure is a vendor datasheet maximum (Arista 7700R4), not a deployment report.
As of2025-10
SourceEngineering at Meta
Reviewchecking…review by 2026-12-02 · standard cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim idmeta-dsf-scheduled-fabric-scale

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.