large-LLM job failure rate, top-5% most resource-intensive tasks (Alibaba Unicron); ~37% hardware-attributed, ~73% restart-recoverable

~43.4%observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeFailure rate of the top-5% most resource-intensive large-LLM jobs in one production fleet (Alibaba, Unicron paper), not a per-job, per-GPU or fleet-wide rate. ~37% of the failures are hardware-attributed and ~73% are recoverable by restart on that fleet; the paper does not establish device-population exposure, so this must not be annualized into a component failure rate or applied to another operator's job mix.
As of2024
SourceUnicron (He et al., arXiv 2401.00134)
Reviewchecking…review by 2026-08-29 · fast cadence
Recorded changeslast 2026-07-03 · 2 revisions tracked
Claim idlarge-llm-job-failure-rate-top-5-most-resource