on-site gas LCOE must be modeled for the named plant from heat rate, gas price, capacity factor, capex and financing, O&M, emissions and permits, interconnection and standby costs

Project-specific LCOErecommendation

Value kindrecommendation — Recommendations are design guidance, not measured facts; validate them against the project boundary conditions.
ScopeEIA's combined-cycle benchmarks are not a portable industrial behind-the-meter engine price.
As of2026-08-24
SourceU.S. Energy Information Administration · Levelized-cost methodology and technology-specific assumptions
DerivationNo universal number is retained. The project model must expose every plant, fuel, financing, emissions, interconnection and standby assumption.
Reviewchecking…review by 2026-09-23 · fast cadence
Recorded changeslast 2026-08-24 · 3 revisions tracked
Claim idindustrial-gas-fired-lcoe-for-on-site-btm-power

Where the guide uses it

Not quoted in a chapter yet; it is kept in the curated register.