IEEE 519 current-distortion (TDD) limit at the PCC, sliding with the Isc/IL short-circuit ratio; voltage THD capped at 5% (1–69 kV) / 8% (<1 kV)

5–20% TDDobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2022
SourceComsys · Table 2: PCC current-distortion limits for 120 V–69 kV systems; TDD varies from 5% to 20% by Isc/IL
Reviewchecking…review by 2027-02-06 · slow cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim idieee-519-current-distortion-tdd-limit-at-the