The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

Media-specific Purge techniques may include qualified sanitize-overwrite, block erase, or cryptographic erase; Destroy is a separate sanitization method

Purge = verified sanitize overwrite, block erase, or CE; Destruct is separate/fallbackobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeTechnique acceptability depends on the information-storage-medium type, device command and implementation, data sensitivity, disposition, verification, and validation
CaveatNormal host overwrite is distinct from a dedicated sanitize-overwrite command. Cryptographic erase requires trustworthy key pedigree, coverage, preconditions, and successful verification.
As of2025
SourceNIST SP 800-88 Rev. 2 §§3.1–3.2 · NIST SP 800-88r2 §§3.1.1–3.1.3, 4.5; IEEE 2883 technology-specific requirements
Reviewchecking…review by 2026-09-08 · slow cadence
Recorded changeslast 2026-08-24 · 3 revisions tracked
Claim idieee-2883-2022-no-overwrite-based-method-meets

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.