IEC 61508-6:2010 Annex D maps common-cause score bands to β factors of 0.5%–5% for logic subsystems and 1%–10% for sensors and final elements

0.5–5% logic; 1–10% sensors/final elementsobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeHardware common-cause bands in the IEC functional-safety context; no portable data-center β. Score the subsystem with the Annex D checklist before using a band.
As of2010-04-30
SourceIEC 61508-6:2010 Annex D (Table D.4 score bands); exida guidance on the β ranges · IEC 61508-6:2010 Annex D, Table D.4: score bands for logic subsystems (0.5/1/2/5%) and sensors/final elements (1/2/5/10%); exida blog paragraph citing Annex D
Reviewchecking…review by 2027-03-08 · slow cadence
Recorded changeslast 2026-09-16 · 3 revisions tracked