Index rebuild capacity in the stated retrieval case
about 2.0 TBderived
| Value kind | derived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method. |
|---|---|
| Scope | Illustrative inputs; qualify project rates and limits before selection. |
| As of | 2026-09 |
| Source | Guide derivation from Chapter 9.7 stated assumptions; primary method. |
| Derivation | (100000000 × 768 × 4 / 1e9 + 64 + 32) × 2 replicas × 2 generations / .8 / 1000 = 2.016 TB. |
| Review | checking…review by 2027-03-05 · standard cadence |
| Recorded changes | last 2026-09-16 |
| Claim id | guide2-t23-retrieval-index-capacity |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.