Release time in the stated sequential preparation case

about 33 hderived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopeIllustrative inputs; qualify project rates and limits before selection.
As of2026-09
SourceGuide derivation from Chapter 9.9 stated assumptions; primary method.
Derivation(1000000/64/3600 + 6 + 1e9/(32*2000)/3600 + 2 + 1e13/(8192*40000)/3600 + 1) × 1.25 = 32.697076 hours.
Reviewchecking…review by 2027-03-05 · standard cadence
Recorded changeslast 2026-09-16
Claim idguide2-t23-prep-release-time