Raw capacity for the stated one-petabyte erasure-code placement case
about 1.8 PB rawderived
| Value kind | derived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method. |
|---|---|
| Scope | Illustrative inputs; qualify project rates and limits before selection. |
| As of | 2026-09 |
| Source | Guide derivation from Chapter 9.6 stated assumptions; primary method. |
| Derivation | 1.0 PB × (8+3)/8 / (1−.25) = 1.8333333333333333 PB raw; select the next eligible hardware configuration. |
| Review | checking…review by 2027-03-05 · standard cadence |
| Recorded changes | last 2026-09-16 |
| Claim id | guide2-t23-object-raw-capacity |