Single rank prefix fetch in the stated KV case

about 22 msderived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopeIllustrative inputs; qualify project rates and limits before selection.
As of2026-09
SourceGuide derivation from Chapter 9.7 stated assumptions; primary method.
Derivation2 × 80 × 8 × 128 × 2 × 8192 / 8 / 20e9 + .005 = .021777216 seconds; all delivery rates and delays are assumptions.
Reviewchecking…review by 2027-03-05 · standard cadence
Recorded changeslast 2026-09-16
Claim idguide2-t23-kv-prefix-fetch