Worst protected captured-state age in the stated asynchronous case

355 sderived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopeIllustrative inputs; qualify project rates and limits before selection.
As of2026-09
SourceGuide derivation from Chapter 9.4 stated assumptions; primary method.
Derivation270 + 20 + 60 + 5 = 355 seconds; S=300 gives 385, above the assumed 360-second limit.
Reviewchecking…review by 2027-03-05 · standard cadence
Recorded changeslast 2026-09-16
Claim idguide2-t23-checkpoint-state-age